Fast Track Interconnection Process for Commercial Solar Projects is Streamlined with the Incorporation of Integration Capacity Analysis (ICA) Tools within California’s Rule 21
California’s “ Rule 21 ” tariff specifies the interconnection, operating, and metering requirements for behind-the-meter (BTM) generation facilities that are