Blog > Resource Guide

Energy Toolbase – Chint Power Systems (CPS) Energy Storage Integration Resource Guide

1.) Overview CPS – ESS Integration on Energy Toolbase

2.) Energy Toolbase iEMS

3.) Signing up for the Commercial CPS Integration 

4.) Using the CPS ESS Integration

5.) Transactions when using the CPS ESS integration 

6.) Final Checklist

 

undefined

Click to download the PDF version

Overview CPS ESS Integration on Energy Toolbase

Energy Toolbase has integrated Chint Power Systems (CPS) Commercial Energy Storage System (ESS) solutions onto the Energy Toolbase (ETB) Platform. This integration enables ETB users to run energy storage dispatch simulations and savings analysis that are representative of how CPS ESS products controlled by the Energy Toolbase iEMS controller would operate in the field.

 undefined

CPS has introduced its next-generation, turn-key commercial energy storage system (ESS) solution that begins with a building block of 62.5 kW / 268kWh and can be expanded upwards. CPS’s ESS is paired with Energy Toolbase’s Intelligent Energy Management System (iEMS) storage control software, providing a turnkey solution for solar + storage developers. The CPS system is contained in a pre-engineered, NEM 3R, UL9540A certified pending for plug and play operation. The system comes standard with a 10-year, full wrap warranty on all components: battery, inverter, enclosure, and all electronics. The CPS system comes standard with pre-factory testing prior to shipping and includes on site commissioning.

Energy Toolbase has worked with CPS to validate the ESS hardware specifications which have been pre-loaded onto the ETB platform. This allows users to quickly evaluate their standalone-ESS projects or PV+ESS projects, on any of Energy Toolbase’s 60,000+ utility rate schedules. The CPS integration streamlines the project development workflow for commercial storage developers and gives them the confidence to know they are running validated savings and economic analysis.