Acumen EMS™ Deployed at Minnesota Electric Manufacturing Headquarters

Acumen EMS™ Deployed at Minnesota Electric Manufacturing Headquarters
Project Summary

Location

Faribault, Minnesota

ESS Provider

BYD

System size

120kW/266kWh

Deployment Date

August 2023

Facility type

Manufacturing Facility

EMS Application

Demand Charge Management

The Challenge
All Energy Solar, a project developer based in St. Paul, Minnesota, was searching for a solution for the host customer, Trystar, a leading designer, manufacturer, and supplier of electrical power solutions for the entire power market. The customer wanted a solution that would reduce demand charges at their expansive manufacturing facility that could accompany its existing solar PV system. The site is a part of Steele-Waseca Co-Op Electric (SWCE) where the on-peak hours are during the manufacturing facility’s prime operating times.
The Solution
All Energy Solar tapped BYD, a direct storage hardware partner of Energy Toolbase, to procure a turnkey energy storage system. At Trystar’s 120,000-square-foot factory, All Energy Solar deployed a BYD CHESS 120kW, 2-hour energy storage system equipped with Energy Toolbase’s Acumen EMS™ controls software. The Acumen-controlled ESS is situated alongside a 173kW  SolarEdge solar system. The primary controls application is Demand Charge Management, and the customer will be leveraging the ETB Monitor platform for live updates on performance and savings.   

Recent Posts

Blog Categories

Follow us on

Upcoming Webinars

Newsletter

Get our content straight to your inbox

subscribe to our monthly newsletter and receive our blogs, webinars and other announcements.