Case Studies
Solar paired system provides demand charge management to reduce peaks for manufacturing facility
- Tracy Fosterling
- Acumen EMS, Demand Charge Management
Project Summary
Location
Dickson, Tennessee
ESS Provider
Chint Power Systems
System size
180kW/390kWh across 4 sites
Deployment Date
May 2020
Facility type
Manufacturing facility
EMS Application
Demand Charge Management,
The Challenge
The office supply manufacturer with a 400,000+ square foot manufacturing facility and warehouse wanted to pair energy storage with their roof-mounted solar PV system to shave peak demand, which results in high demand charges and electric bills. Energy Toolbase’s Acumen EMS™ integrated with a Chint Power Systems (CPS) energy storage system was deployed to optimally shave peak and reduce the customer’s demand charges.
Recent Posts
Blog Categories
Follow us on
Upcoming Webinars
Newsletter
Get our content straight to your inbox
subscribe to our monthly newsletter and receive our blogs, webinars and other announcements.