Southern California Logistics and Fulfillment Center Installs Energy Storage System to Complement Existing Solar System and Offset High Demand Charges

Southern California Logistics and Fulfillment Center Installs Energy Storage System to Complement Existing Solar System and Offset High Demand Charges

PVCA, a California-based commercial electrical contractor specializing in solar operations and maintenance, was searching for a solution at a fulfillment center that needed to reduce demand charges after a change in the utility’s rate structure it w as on. PVCA selected Energy Toolbase’s Acumen EMS™ paired with Socomec’s HES L battery to install alongside the solar system to target those high demand charges that typically occur in the afternoon hours.

40-acre Senior Community Center deploys BYD energy storage system paired with Acumen EMS™ under Wisconsin’s Office of Energy Innovation grant

40-acre Senior Community Center deploys BYD energy storage system paired with Acumen EMS™ under Wisconsin’s Office of Energy Innovation grant

Arch Electric, a Wisconsin-based solar company, was searching for a solution that would reduce the current energy and demand at a senior center that was placing sustainability at the forefront. Having already been modeling the project in the ETB Developer platform, the Arch Electric team turned to ETB to provide the all-in-one solution that encompassed the hardware and software components needed, making for a smooth, simple, and efficient installation.

Acumen EMS Deployed at Costa Rica Lab to Reduce Energy and Demand Charges

Acumen EMS Deployed at Costa Rica Lab to Reduce Energy and Demand Charges

Laboratorios Calox selected Sunshine Energy Corp, one of Costa Rica’s leading solar developers, to support them in procuring and installing an ESS. Sunshine connected with BYD Panama, who is a direct storage-hardware partner of Energy Toolbase, to procure a turn-key energy storage system.